|
|---|
| Product name: Xinbei Breast Pump | Product name: Xinbei Breast Pump |
| Product number: 100051735450 | Product number: 100051735450 |
| Gross weight of product: 1.05kg | Gross weight of product: 1.05kg |
| Origin of goods: Jiangsu | Origin of goods: Jiangsu |
| Noise: below 40dB | Noise: below 40dB |
| Type: Wired separation | Type: Wired separation |
| Function: Double rhythm breast suction | Function: Double rhythm breast suction |
| Domestic/Imported: Domestic | Domestic/Imported: Domestic |
| Style: Double sided | Style: Double sided |
| Battery capacity: above 2000mAh | Battery capacity: above 2000mAh |
| Disinfection method: drying disinfection | Disinfection method: drying disinfection |
| Power supply method: pluggable and rechargeable | Power supply method: pluggable and rechargeable |
| CCC mandatory certification: CCC certification | CCC mandatory certification: CCC certification |